|
|
|
Maya Pipe Insulation may be slipped over pipe or tubing before pipe connections are made. Fabricate fitting cover from properly miter-cut pieces, snap fitting cober in place over the fitting and bonding with adhesive. Where piping is in place, use a sharp kinfe to slit MAYA Pipe Insulation longitudinally and snap the Insulation over the pipe. Refer to the following figure 1-6.. |
||
|
Step1: When pipe has been installed, slit the insulation longitudinally and snap it over the pipe Step2: Brushing the slit surfaces with adhesive. Step 3: After drying, press joint firmly together..
|
|
If the information you are looking for is not available, please feel free to contact us. |