maya

Insulation tube

 

 

 

st4

Step4: Tee is fabricated from miter cut or free hand cut and the 45o cuts are bonded by adhesive.

st5

Step 5: The assembling

st6

Step 6: The assembling of valve and elbow

 

 

 

Maya Pipe Insulation may be slipped over pipe or tubing before pipe connections are made. Fabricate fitting cover from properly miter-cut pieces, snap fitting cober in place over the fitting and bonding with adhesive.

Where piping is in place, use a sharp kinfe to slit MAYA Pipe Insulation longitudinally and snap the Insulation over the pipe. Refer to the following figure 1-6..

 

 

 

 

 

 

st

Step1: When pipe has been installed, slit the insulation longitudinally and snap it over the pipest2

Step2: Brushing the slit surfaces with adhesive.

st3

Step 3: After drying, press joint firmly together..

 

If the information you are looking for is not available, please feel free to contact us.